*WORK CARRIED OUT TO MG MIDGET CKR412K*

  1. To receive vehicle , strip down, removing all chrome work , lamps, windscreen, and hood assembly. Further removing, body panels , bonnet, boot lid, doors (removing all furniture ) and front wings . strip out all interior trim seats ,carpet,and dash board.
  2. Remove engine and transmission unit .
  3. Strip shell down to bare metal, and ancillary panels , carry out minor welding repairs to the shell, n/s rear quarter lower, o/s sill panel and inner wing area, . Weld in new part panel to o/s front wing to make good, manufacture panel for inner skin on the bonnet. Prepare entire vehicle and paint with a zinc coating to give more corrosion resistance.
  4. Carry out the same treatment to all ancillary panels , prepare and prime as necessary the entire exterior of vehicle and including engine bay.
  5. Prepare shell and all panels for paint , then re paint to original colour. (Mallard Green)
  6. Proceed to rebuild vehicle using all new parts as is listed on the invoice,
  7. Split engine and transmission unit , remove clutch assembly and flywheel, have the fly wheel refaced , re install along with new clutch assembly and sump gaskets etc.
  8. Install new interior trim in original colour and new carpet set . Have new hood made in Tan and install to vehicle. Refit re-chromed items as the rear bumper corners, door handles and seat back levers.
  9. Reinstall Engine and transmission, new master cylinders(brake and clutch), refurb heater box, clean carburettors , replace coolant pipe, track rod ends and steering boots.
  10. Refit doors bonnet and boot lid and align as necessary.
  11. Install new windscreen rubbers and glass, replace rubbers to quarter light windows re fit to vehicle .
  12. Carry out small engine service , bleed braking system, and clutch system , carry out mot , road test.
  13. Carry out final polish
  14. Re deliver to customer .